How competent is competent? More importantly, how much might it actually cost your operations if you were to entrust your pumps to the wrong shop?
This article is the last installment in a four-part series based on a presentation delivered at the 2007 NPRA Reliability & Maintenance Conference in Houston, TX. As in the previous installments, (which ran in the July and September 2007 and February 2008), the authors discuss how to distinguish competent pump repair operations.
In this fourth and concluding part in our series on non-OEM pump repair facilities, we discuss two actual case studies. As you read on, please recall that we coined the acronym “CPRS” to convey the term Competent Pump Repair Shop.
Repair case study #1:
Two IR Type J4x 15
lean amine pumps
The first of our two case studies concerns the repair of two
IR Type J4 x 15 radially split, double suction, betweenbearing
pumps purchased in 1982 for lean amine service.
Figs. 1 through 3 provide specifics.
The pumps were to be repaired using new 316 stainless steel casings and heads furnished to a CPRS by the refinery client. The client had bought these parts from the “current” OEM—a successor company to the initial OEM. While one pump was being repaired, the other pump remained in service, operating without a spare. However, the new casings and heads required considerable rework before they could be used. This rework included:
Based on the location of the bolt holes in the bearing housing mounting flanges, neither cast casing was symmetrical with respect to its shaft centerline. The new casings and covers also were drilled for the bearing housing alignment dowel pins. The casing and head for the second pump were returned to the “current” OEM after a pinhole leak was discovered while air testing the mechanical seals. The second pump was returned to the refinery with the original carbon steel casing and head.
Repair case study #2:
Worthington Type 8 UZDL21
multistage ash sluice pump
A Worthington Type 8 UZDL21 two-stage pump from
a power plant was received by this CPRS in 2006. It
was disassembled and inspected and the names of the
personnel involved in this work were recorded in the
evaluation. By recording these names, the owner-operator
(“client”) of the pump was able to ascertain the experience
levels of staff assigned to dismantling and inspection
duties. Client representatives were in attendance for the
inspection and met with CPRS personnel. A comprehensive
Inspection Report & Repair Proposal was generated,
submitted and quickly approved by the client. Repairs
were started without delay.
The purpose of an Inspection Report and Repair Proposal is to evaluate repair options and/or design changes that may (or may not) be included in the repair plan, but which the examining engineer believes could increase the run time of the pump. The following design changes were implemented in this repair sequence:
Based on the condition of the ash sluice pump and conversations with the client, the abrasive action of the ash sluice mixture limited the run time of the 316 stainless steel pumps to between 12 and 18 months. Based on the client’s information package, this particular pump had operated for about 18 months and was taken out of service due to a catastrophic thrust bearing failure. In turn, this failure caused rubbing of the 2nd stage impeller back shroud to the casing and the shaft-to-thrust-end cover. The direction of thrust was away from the coupling and opposite to the preferred direction for the SKF/MRC “PumPac 8317 AB” bearing. The wear ring clearances were abnormally large and there was no evidence of oil in the thrust bearing or in its housing. Other damaged components included:
The most probable and primary cause of the failure was (initially) determined to have been lack of lubrication to the thrust bearings. Nevertheless, the failed radial bearing showed a slight hint that there had, in fact, been oil in its housing. The CPRS examining engineer realized that the pump could not have operated for 18 months without oil in the bearing housings. Hence, lack of oil was judged a maintenance issue that would have to be addressed at the plant.
But, the examining engineer also believed that a thrust bearing failure could have occurred—even if the housings did have the required amount of oil. He knew that Type 8317 AB bearings, as had been installed, are designed to carry axial thrust toward the coupling. Calculations were made indicating that, with normal running clearances, the direction of thrust would be toward the coupling.
From common pump experience, the CPRS reasoned that wear ring clearances become larger with time; the direction of axial thrust then reverses. Further calculations demonstrated that if the pressure on the backside of the second stage impeller is 17-psi lower than on the front shroud, the axial thrust force will be approximately 3000 lbs away from the coupling. A 17-psi reduction in pressure can occur due to excessive leakage across the balance drum wear ring to the first stage impeller suction chamber. To overcome the thrust reversal problem, two recommendations were more closely evaluated by the CPRS:
Comments on wear rate of rings and bushings…
The informative input from a CPRS explains why a certain
course of action is recommended.
The report generated during this case study discussed
the following items:
1. Flushing One method of reducing the wear rate of the rings and bushings would be to reduce the concentration of abrasive matter forced through the running clearances. Flushing the rings and bushings with clean water would accomplish this. (Slurry pumps used in refineries are often designed with this feature.) This option was briefly discussed but did not seem to be feasible due to the lack of high-pressure clean water at or near these ash sluice pumps. Low-pressure water is available for bearing housing cooling and mechanical seal flushing. If this option were to be pursued, it would be necessary to determine the flow rate and pressure of the water needed so that a booster pump could be selected and the economics of the system could be evaluated.
Another source of flush water that might be investigated would utilize separators to remove fly ash from a small side stream of the pump’s discharge. However, the maintenance cost associated with separator wear might make this option uneconomical.
2. Ring and bushing geometry The CPRS now considered various popular wear ring configurations. The examining CPRS engineer believed that the pump was last repaired with “saw tooth” type rotating rings and smooth stationary rings and bushings. For the same running clearance and differential pressure per length of seal, this style has the lowest leakage rate. The “saw tooth” geometry disrupts the flow causing high turbulence and thus increases the friction coefficient. During the inspection process it was noted that the rotating wear rings for this pump were oriented so that the direction of flow was opposite to normal. This would most likely cause the wear rings to become less efficient— to have higher leakage rates. In an abrasive-laden ash sluice service the saw-tooth wear ring profiles, stationary casing wear rings and balance drum bushings would show wear. The disassembled pump showed this to be the case. The outside diameter of the 300-series stainless steel impeller wear rings had a hard surface coating, but the inside diameters of the 300-series stainless steel case wear rings and balance drum bushing were soft. It was assumed that the stationary wear parts supplied by the client had a hard surface coating but that it had worn away.
This is where experience helps. The CPRS had recently repaired a multistage pump in coke cutting (abrasive) service. In this instance, the stationary wear rings and bushings incorporated “saw tooth” geometry and the rotating rings were smooth. The impeller wear surfaces had been overlayed with Stellite 6 (42 RC) and the stationary wear rings and bushings were made from 440 C material (48/52 RC). When, after three months of service, the pump was shut down due to a sleeve bearing failure caused by insuffi- cient oil, it was discovered that the smooth cylindrical wear surfaces on the impeller had become grooved due to the abrasive coke fines.
Based on these two experiences (and notice how the CPRS uses what it learns), the lead examining engineer believed that the “saw tooth” grooves trap and, therefore, locally increase abrasive particles. This then causes greatly accelerated wear. The trapped abrasive particles can originate from the pumpage and from the worn hard-coated surfaces. High turbulence created by the “saw tooth” geometry also increases the wear rate.
In an effort to reduce the rate of wear on the inside surface of the case wear rings and balance drum bushing, the lead engineer recommended changing to the normal smooth ring configuration traditionally used in pumps. This would reduce the impact angle of the abrasive mixture to zero, eliminate much of the turbulence and reduce the high local concentration of abrasives caused by groove trapping. The plain cylindrical surfaces also would be simpler to coat and, accordingly, have a higher bond strength.
Hard surface coating…
The center stage bushing, impeller, case and balance drum
wear rings were to be coated with 0.020” of 88-12 tungsten
carbide (88% tungsten carbide, 12% cobalt) using
the HVOF process. Having access to a good reference
library, the CPRS knew this coating (70-72 RC) had been
recommended in the Proceedings of the 9th International
Pump Symposium (“Evaluation of Coatings for Abrasive
Service”) for slurry services. Running clearances were being
increased over API-610 minimum standards to compensate
for the reportedly low galling resistance associated with
making both the rotating and stationary wear parts from
88-12 tungsten carbide. The design and “as built” running
clearances are shown here in Table I:
Bearing load capacity issues: thrust direction
away from coupling…
When it was received at the CPRS facility, the ash sluice
pump was found to be fitted with MRC (SKF) 8317 AB
PumPac thrust bearings oriented for axial thrust toward
the coupling. With the cracked thrust bearing end cover
and worn back shroud of the second stage impeller, it was
obvious that the thrust direction had reversed.
History is of interest here. PumPac bearings were developed in the mid 1980s to overcome ball skidding in heavyduty applications where the thrust load is in one direction only [Ref. 1]. Ball skidding becomes a more significant problem as bearing size and operating speed increase. At nDm (rpm “n” times mean diameter “Dm”) values below 250,000, there is little risk of ball skidding. (This ash sluice pump with an operating speed of 1785 rpm and a mean bearing diameter of (85 + 180)/2 or 132.5 mm has an nDm value of 236,513.)
Assuming over the life of the ash sluice pump that
the axial thrust load changed direction, a pair of lightly
preloaded 40° angular contact bearings would represent
a better bearing selection. Nonetheless, to evaluate the
improvement in L10 life, calculations were performed for
the existing MRC 8317 AB PumPac bearing set and for a
more conventionally applied SKF 7317 BEGAM bearing
set. PumPac life calculations were performed by one of the
bearing manufacturer’s application engineers. His calculations
were based on an axial thrust load of +/- 3000 lbs
and radial loads of 167 and 250 lbs. They demonstrated
that the values used by the CPRS for bearing life estimates
were in the right league (see Table II, as follows). Again, in
essence, this situation shows what happens when a CPRS
facility involves competent suppliers of pump components
in cooperative analyses: The pump user benefits.
The calculations assumed clean ISO VG 32 oil operating at approximately 160 F [Ref. 2]. It appeared, with the original design, that the oil lubricating both the radial and thrust bearings was trapped in its own sump with the oil level above the center of the lowermost ball. Consequently, the oil level in the original bearing sump was being controlled by the two ½” diameter radial drain holes shown in Fig. 4. By eliminating the bolted-in dams in each bearing housing, the bearing balls would no longer be submerged in the oil and churning would be reduced. The temperature rise would be less and the bearings would run cooler.
The CPRS opted for a larger diameter flinger (7.50” instead of 7”), which now makes it possible for the outside diameter of the flinger to be submerged in 0.25” of oil. A 3/8” diameter third drain hole was added to the bearing bore at the 6 o’clock position to drain oil from the cavity between the inboard bearing covers and the bearings. The inboard covers were notched at that position to provide an unobstructed opening to the drain holes. Again, these reflect small, but important, experience-based changes with major beneficial impact on uptime of the pump [Ref. 3].
The CPRS calculated hydraulic thrust generation (in the axial direction) based on the following assumptions:
At this point, the CPRS engineer listed his assumptions and submitted detailed calculations. At zero flow and P = 260 psi, the calculations corroborated his assumptions, yielding T = 3604 lbs toward the coupling. Similarly, at BEP and P = 220 psi, the calculations indicated thrust T = 3049 lbs toward the coupling.
While we elected to omit further details, the radial bearing loads were investigated in a similar manner. The message, once again, is that one should select a CPRS that will support its recommendations by readily providing the client with every relevant calculation or evaluation [Refs. 4 through 8].
Furthermore, some pump issues deserve to be tackled just as one would approach a new design. The effects of operation with worn running clearances must be considered; with wide-open clearances, only the anti-friction bearings will carry the radial loads [Ref. 9].
CPRS personnel also know that bearing life is reduced by incorrect bearing-to-shaft fits. Therefore, and in this example, relevant dimensions were recorded. Table III shows the bearing vs. shaft interference fits associated with the ash sluice pump. (Note that “T” stands for “tight.”)
Considering the cracked first stage impeller shroud…
As identified in an Inspection Report and Repair Proposal
issued by the CPRS, the outside diameter of the outboard
shroud on the first stage double suction impeller was
cracked at three locations. Each crack occurred adjacent to
a discharge vane tip. These types of cracks are common,
especially on impellers that have accrued relatively long
run times [Ref. 10]. The CPRS knows this and will not try
to sell new impellers where none are needed.
Cracking failures usually result from fatigue associated with pressure pulsations caused by the impeller vanes passing the casing volute tips. The magnitude of these pressure pulsations decreases with the clearance [generally called “B” gap, Ref. 11] between the impeller and volute vane tips. The first stage impeller had a “B” gap that met the API-610 criteria—an important reassurance.
Another, less common, cause of shroud cracking is found on impellers having a natural frequency coincident with a multiple of the operating speed, most frequently the vane passing frequencies. With a 5-vane impeller and two volutes, the pressure pulsations occur at 5 and 10 times running speed of 8900 cpm (148 Hz) and 17,800 cpm (297 Hz). Thus, the natural frequencies of the damaged impeller were measured experimentally using an accelerometer and hammer and the results of this “ring test” cataloged. The lowest natural frequency above running speed was found to be about 658 Hz (22 times running speed).
No conclusive root cause for the cracked shroud was found. The impeller was weld-repaired, re-machined and rebalanced. The shrouds were not thickened as proposed in the original repair scope. The message here: CPRS facilities and their staffs apply scientific principles and analyses every step of the way. (Note: Recent publications, including several “Proceedings of the Texas A&M International Pump Users Symposium,” have shown that new pumps suffering from different resonance phenomena have, on occasion, been delivered and put into service. So, in the case of this ash sluice pump, the testing done by the CPRS was justified, as was deviating from the original repair scope.)
At the conclusion of its work, the CPRS recapitulated and documented the repairs by restating problems and observations, and by again highlighting solutions that were both merely considered and actually implemented. It was a very thorough undertaking, much like this fourpart series, whose purpose, among other things, has been to alert you, the pump user, to the following very important fact:
About Hydro |
All photos in this and other articles in this series were taken by professional photographer Stephen J. Carrera, and used courtesy of Hydro, Inc. Founded in 1969 and headquartered in Chicago, IL, Hydro Inc. is the largest independent pump rebuilder in North America, providing support for industrial, municipal and power generation plants around the world. |
As denoted by the acronym “CPRS,” a truly Competent Pump Repair Shop, be it OEM or otherwise, will provide considerable value to you and your organization through its experience-driven and highly cooperative efforts. Choose wisely when it comes to entrusting your pumps to others.
Regular contributor Heinz Bloch is well-known to Maintenance Technology readers. The author of 17 comprehensive textbooks and over 340 other publications on machinery reliability and lubrication, he can be contacted directly at: hpbloch@mchsi.com Jim Steiger is senior aftermarket engineer with HydroAire, Inc., in Chicago, IL. Telephone: (312) 804-3694. Robert Bluse is president of Pump Services Consulting, in Golden, CO. Telephone: (303) 916-5032.
References used in this series
1. Bloch, Heinz P. and Alan Budris, Pump User’s Handbook: Life Extension, (2006) Fairmont Publishing Company, Lilburn, GA, 2nd, Revised Edition, ISBN 0-88173-517-5
2. Bloch, Heinz P. and Claire Soares, Process Plant Machinery for Chemical Engineers, (1998) Butterworth-Heinemann, Woburn, MA, 2nd, Revised Edition, ISBN 0-7506-7081-9
3. Bloch, Heinz P., “Twelve Equipment Reliability Enhancements with 10:1 Payback”, Presentation/Paper No. RCM- 05-82, NPRA Reliability & Maintenance Conference, New Orleans, LA, May 2005
4. Bloch, Heinz P., “High Performance Polymers as Wear Components in Fluid Machinery,” World Pumps, November, 2005
5. Bloch, Heinz P. and Fred Geitner, Major Process Equipment Maintenance and Repair, (2006) Gulf Publishing Company, Houston, TX, 2nd Edition, ISBN 0-88415-663-X
6. Bloch, Heinz P., “How to Select a Centrifugal Pump Vendor,” Hydrocarbon Processing, June 1978
7. Bloch, Heinz P., “How to Buy a Better Pump,” Hydrocarbon Processing, January 1982
8. Bloch, Heinz P., “Implementing And Practicing Reliability Engineering,” ASME Energy Conference, Houston, TX, January 1996
9. Bloch, Heinz P., Machinery Reliability Improvement, Gulf Publishing Company, Houston, TX, 3rd Edition (1998) ISBN 0-88415-661-3
10. Bloch, Heinz P. and Fred Geitner, Machinery Failure Analysis and Troubleshooting, (1997) Gulf Publishing Company, Houston, TX, 3rd Edition, ISBN 0-88415-663-1
11. Dufour, John W., and William E. Nelson, Centrifugal Pump Sourcebook, (1993) McGraw-Hill, New York, NY, ISBN 0-07-018033-4