Industry Outlook: Proactive Maintenance Helps Reduce Energy Costs

barbara_hulit
Barbara Hulit, President, Fluke Corporation

In the midst of all the talk about being green and environmental impacts of industrial operations, one fact seems to get lost—reducing energy consumption saves you money. That fact translates to a lot of other benefits, including competitive advantage, reduced MRO over time, increased ability to plan maintenance expenditures and, thus, forecast budgets, etc.

With rare exception, EVERY industrial facility can reduce its energy consumption. Why, then, don't more do it? When energy costs were low, it wasn't a priority. Now it's making a lot more sense. But, where do you start? Fluke emphasizes two approaches.

  1. Practice proactive, rather than reactive, maintenance. This will keep equipment operating at optimal efficiency and require less energy.
  2. Conduct regular energy audits to map energy consumption patterns and implement new practices to reduce usage.

This magazine has long sung the praises of proactive maintenance—using readily available tools to identify and abate equipment degradation. While there are startup costs to this strategy over the run-to-fail method, the savings accrue relatively quickly, typically within 18 months.

So, how much can you save by adopting proactive maintenance practices? Consider that reactive maintenance due to labor, equipment replacement and downtime costs three to five times as much as proactive maintenance. Then, add 20% more savings from reduced energy use. That's because poorly-maintained equipment requires more energy to function. Think about worn bearings or misaligned shafts or highresistance connections.

When moving to proactive maintenance, keep it simple at the outset. Combine your knowledge of key equipment with manufacturer-recommended maintenance cycles to create a maintenance schedule, and then inspect-as-you-go. Newly-affordable tools like thermal imagers make it possible for maintenance staff to quickly survey plant equipment on a regular basis and identify many types of equipment degradation early on.

Conducting an energy audit also can help you prioritize equipment for your maintenance schedule. Start with an energy study and then target the biggest energy culprits in manufacturing facilities—inefficient equipment and the HVAC system.

An energy consumption study requires a power logger that can monitor voltage and current simultaneously and measure power factor. If the power factor at your facility is too low, it means you are not managing your power effectively, and the utility will charge a higher rate. Once you log energy consumption over time, for each part of the plant you'll see what system aspects are consuming energy when. You then can rebalance loads, schedule for off-peak hours or upgrade equipment.

When evaluating your equipment, consider these points. Have you installed newer-model variable frequency drives where possible? Have your circuits and systems been thermally scanned? If not, you may not be aware of overloaded or imbalanced circuits, loose connections, overheating motors, malfunctioning steam traps and a host of other conditions that could signal inefficient use of energy.

The overhead cost of the HVAC system is an afterthought to most facilities. But, when is the HVAC system cycling on? Has the equipment been updated? Chillers often use up to 30% more energy than required as a result of system inefficiencies. Neglected boilers and AC units also become less efficient over time.

The fact that proactive maintenance is "green" may be nice, but beyond the "color" are the economics. They just make sense. MT


This article is part of Maintenance Technology’s 2008 Industry Outlook, the annual executive roundtable. Columns from each of the 14 thought leaders who participated can be found at the following link: http://www.mt-online.com/article/0808-industry-outlook

Maintenance Technology is sent free to qualified subscribers each month. Visit www.subscribeMT.com to fill out an online application for your free one-year subscription today. By doing so, you will join more than 50,000 technical and business professionals who already receive Maintenance Technology magazine, your source for capacity assurance solutions.

Newsletter Sign Up



Your First Name:

Your Last Name:

Your E-Mail Address:

Would you like our Newsletter?:

Enter verification image value
  

Featured White Paper

fluke-white-paper-aprilWIRELESS TEST TOOLS CAN CUT TROUBLESHOOTING TIME

By: Fluke Corporation

The automation of more and more processes and operations in today’s factories and commercial buildings is helping to reduce energy consumption and increase safety and productivity as never before. However, automation has also added a large dose ofcomplexity for the technicians who maintain and troubleshoot the systems. Click here to learn how Fluke's CNX 3000 Wireless system can help. 

Featured Supplier: New Pig

newpig

New Pig’s PIG® Latching Drum Lids enable quick, easy drum access and secure closure to help meet closed container regulations. Designed to open and close easily with one hand, the Lids keep drum contents dry and pure without hassle.

Click here to see PIG Latching Drum Lids in action.

Do you control your maintenance, or is it controlling you?

Are you struggling with a high ratio of emergency (unplanned) to planned work orders, a huge backlog, a lack of sufficient resources, an inability to balance the work load, constant work interruptions, not having parts when needed, recurring failures, and much more. In these lean times, when more is expected from fewer resources, having a highly efficient maintenance program with thoughtful planning and scheduling is the key to success.  

This white paper will help you reduce maintenance costs and maximize efficiencyClick here to download the White Paper.