Electrostatic precipitators (ESP) filter exhaust gases emitted from industrial, utility power and refuse incineration plants, and collect and remove pollutants such as dust, soot and aerosols. Changes in operational conditions or new emissions regulations can require an increase in ESP collecting efficiency. To comply, plant operators can either mechanically expand the precipitator itself or increase performance by installing new control equipment. The process, however, can be more efficient.
Siemens Industry, Inc., has introduced a mobile test unit for electrostatic precipitators to the U.S. market. Now, plant operators can gather information about the status of an ESP and its optimization potential by installing a temporary controls upgrade. The new container-based system helps maximize uptime and reduce testing costs by giving plant operators information about the status of a connected ESP—while also providing data for performance improvement and energy savings. Easy transport and quick installation eliminate the need for complete precipitator shutdown.
On the outside, this testing unit looks like a standard 20-ft.-long shipping container. Looking inside, though, it's an entirely different story.
The container houses a high-voltage mid-frequency power supply and all the control- and optimization-systems necessary to operate one ESP field. The pre-installed equipment includes an insulated gate bipolar transistor (IGBT) mid-frequency inverter, a high-voltage transformer rectifier, a PC with monitoring and optimization software and all required cables for conducting pre-installed test procedures. Advanced power electronics and proprietary software optimize energy usage and reduce harmful plant emissions. All that's needed are some minor adjustments to adapt the unit to specific local conditions.
Setup and commissioning of the Siemens mobile ESP test unit generally takes just one business day—that's roughly a third of the time required to construct a test installation on-site from the ground up. More important is the fact that this containerized system can be installed with little or no interruptions to a facility's ESP operation. A typical test installation duration is 30 days.
Siemens Industry, Inc.
Atlanta, GA
WIRELESS TEST TOOLS CAN CUT TROUBLESHOOTING TIMEBy: Fluke Corporation
The automation of more and more processes and operations in today’s factories and commercial buildings is helping to reduce energy consumption and increase safety and productivity as never before. However, automation has also added a large dose ofcomplexity for the technicians who maintain and troubleshoot the systems. Click here to learn how Fluke's CNX 3000 Wireless system can help.

New Pig’s PIG® Latching Drum Lids enable quick, easy drum access and secure closure to help meet closed container regulations. Designed to open and close easily with one hand, the Lids keep drum contents dry and pure without hassle.
Are you struggling with a high ratio of emergency (unplanned) to planned work orders, a huge backlog, a lack of sufficient resources, an inability to balance the work load, constant work interruptions, not having parts when needed, recurring failures, and much more. In these lean times, when more is expected from fewer resources, having a highly efficient maintenance program with thoughtful planning and scheduling is the key to success.
This white paper will help you reduce maintenance costs and maximize efficiency. Click here to download the White Paper.